Free Press Release Center Logo
We have signed the
Business Ethics Pledge
News Now logo
  Home | About Us | Keyword Directory | Business Directory | Media Directory Sat 30 Aug 2008
  Sample Press Release | Press Release Articles | Press Releases and SEO | Press Release Book Read our Blog
 

Triple Diamond Energy Spuds the McClure-Diamond No.1 Well

Oil and gas drilling company Triple Diamond Energy begins drilling of a prospective well in Garvin County Oklahoma.

PDF  View as PDF  Print View

March 13, 2008 (FPRC) -- Addison, TX – Triple Diamond Energy Corp. (TDEC) announced today the ‘spud’ of McClure Diamond #1 well, the first well of the McClure Diamond No. 1 project in Garvin County, Oklahoma.

In an oil drilling project, spudding marks the first entry of the drill into the earth at the point of a prospective oil well. Prior to the spudding of the McClure-Diamond No. 1 well, Triple Diamond Energy Corp. conducted extensive geological studies and analyzed past oil drilling performance throughout the Garvin County Oklahoma area.

“Oklahoma is a very active region for oil – and particularly Garvin County. We anticipate that the oil reserve under the McClure Diamond No. 1 prospect to exist at around 5,000 feet below the earth’s surface,” says Robert Jent, President of Triple Diamond Energy Corp.

The primary objectives of the McClure Diamond #1 well include the Pennsylvanian age 1st, 2nd, and 3rd Tuley sands of the Hoxbar formation, as well as the lower 1st, 2nd, and 3rd Deese Sands of the Deese formation. These objectives represent names of rock formations named by state geologists that exist from around 3,200 to 5,000 feet below the earth’s surface.

Soil samples, called “core” samples, will be taken every 10 feet of the drilling process and will be analyzed by Triple Diamond Energy geologists. Geologists evaluate the samples and make the determination about the probability of the presence of oil in the prospective well. As the drill comes closer to its 5,000-foot target, TD samples will be evaluated every 5 feet.

Jent estimates that the drilling process will last approximately eight to ten days. If oil is found, Triple Diamond Energy will begin the process of completing and equipping the well so that oil may be extracted and transported. It will then be processed into various types of consumer fuel.

About Triple Diamond Energy: Triple Diamond Energy Corporation is engaged in the acquisition and development of high quality verifiable oil and gas reserves with a primary focus to obtain undervalued producing properties with optimal life potential at the lowest possible cost. Triple Diamond Energy is a privately held corporation located in Dallas, TX. With extensive experience in energy, finance and marketing, the management team is committed and dedicated to maximizing returns.


Send an email to Linda Harris of http://www.triplediamondenergy.com
972-267-8600

Keywords: Triple Diamond Energy, TDEC


Sign in

Register here.
Forgotten password?


Press releases by industry
Advertising
Aerospace and Defense
Architecture
Arts and Entertainment
Audio and Video
Automotive
Baseball
Basketball
Beauty
Beverages
Business
Chemicals
Christianity
Communication
Computers
Consumer
Crops
eCommerce
Economy
Education
Employment
Energy
Environment
Events and Trade Shows
Fashion
Finance
Food
Football
Forestry
Fundraising
Golf
Government
Hardware
Healthcare
Holidays
Human Resources
Immigration Services
Information Technology
Insurance
Internet
Investment Services
Legal
Leisure
Lifestyle
Linux and Open Source
Maritime
Media
Photography
Plumbing and Heating
Politics
Public Relations
Railroads
Real Estate
Religion and Faith
Restaurants
Retail
Science
Society
Software
Sports
Technology
Television
Toys
Trade
Transportation
Travel and Tourism
Trucking
Volunteer
Waste Management
Water

[ Vist our sister sites: Linux news | Bible Notes | Bible Study Tool ]
[ Technology Blog ]

Site design and layout copyright 2005-2008 Free Press Release Center